Our work, job by job: each project's photos run from the start of the job to the finished surface.
Kerbing for a new development
Swipe →
Precast concrete kerbs set out and installed on a prepared base before the road layers and surfacing go down.
Step 1. Setting precast concrete kerbs on the prepared baseStep 2. Kerb line installed and levelled along the new roadStep 3. Completed kerb lines, ready for layerworks and surfacing
New road: prime coat to asphalt
Swipe →
A new road built in stages: the compacted base is primed, then the asphalt layer is laid and levelled by hand at the edges.
Step 1. Prime coat sprayed onto the compacted road baseStep 2. Prime coat curing around the bend of the new roadStep 3. The full length of the road primed and ready for asphaltStep 4. Crew starting the asphalt layer at the primed edgeStep 5. Raking and levelling the asphalt joint by handStep 6. Asphalt layer advancing along the road
Wine farm access road
Swipe →
A tar surface for a farm road running between the vineyards, from the gate to the far end.
Step 1. Starting the asphalt at the farm gateStep 2. Laying asphalt between the vineyard rowsStep 3. Asphalt spread along the full length of the roadStep 4. Compacting the edges with a plate compactorStep 5. Final rolling of the new farm road
Retail parking lot
Swipe →
Resurfacing a shopping centre parking area in sections while the site stayed in use.
Step 1. Laying new asphalt in the parking areaStep 2. Roller compacting the first sectionStep 3. Hand-raking asphalt ahead of the rollerStep 4. Finishing the joins around the parking baysStep 5. Final rolling of the finished parking lot
Farm yard surfacing
Swipe →
A large yard surfaced in asphalt so vehicles and trucks can turn and park on a solid surface.
Step 1. Laying asphalt across the yardStep 2. Rolling the new surfaceStep 3. Compacting the last section of the yard
Long farm driveway
Swipe →
A wide driveway along the property fence, surfaced and rolled from end to end.
Step 1. Rolling the new tar drivewayStep 2. The finished driveway
Farm lane
Swipe →
A tar driveway through open farmland, laid on a prepared gravel base.
Step 1. Spreading asphalt over the prepared baseStep 2. Rolling the asphalt along the laneStep 3. Completed section of the lane
Orchard lane
Swipe →
Surfacing a lane between orchard trees in two halves, so access stayed open during the work.
Step 1. First half of the lane laid with asphaltStep 2. Rolling the second halfStep 3. Both halves laid and compacted
Driveway along a brick wall
Swipe →
A long driveway beside a brick boundary wall, with a concrete water channel along the edge to carry rainwater away.
Step 1. Raking hot asphalt along the water channelStep 2. Rolling the new asphaltStep 3. Compacting along the wall and channelStep 4. Final rolling of the finished driveway
School walkway
Swipe →
New asphalt for a covered walkway between school buildings.
Step 1. Spreading asphalt under the covered walkwayStep 2. Levelling the surface before rolling
Courtyard resurfacing
Swipe →
Resurfacing a courtyard between residential buildings.
Step 1. Spreading asphalt along the boundary wallStep 2. Crew levelling the new surfaceStep 3. Compacting with a pedestrian roller
Apartment block driveway
Swipe →
Patching and resurfacing the access road at an apartment complex.
Step 1. Raking hot asphalt into placeStep 2. New surface laid along the building
Roadside strip
Swipe →
Surfacing a strip alongside a busy road, with the edges compacted by plate compactor.
Step 1. Spreading asphalt along the roadsideStep 2. Compacting with a plate compactorStep 3. Final compaction of the finished strip
Home driveway
Swipe →
A residential tar driveway laid right up to the gate.
Step 1. Raking asphalt onto the drivewayStep 2. Levelling the surfaceStep 3. Compacting up to the gate
More tar driveways
Swipe →
More of our driveway work, from spreading the asphalt to the finished surface.
Step 1. Spreading asphalt on a gravel drivewayStep 2. Laying a new driveway with mountain viewsStep 3. Rolling a hedge-lined private laneStep 4. A finished tree-lined drivewayStep 5. A finished driveway beside the lawn
Road resurfacing
Swipe →
Street and parking resurfacing with a paving machine and rollers, including night work to keep roads open by day.
Step 1. Paving machine laying asphalt on a streetStep 2. Night paving under street lightsStep 3. Laying the new road surface at nightStep 4. Roller compacting the fresh asphaltStep 5. Final rolling of the resurfaced area